Category
Cold Metal C Purlin Steel Frame C Profile Making Light Keel Stud Cold Rolling Mill C Profile Channel Furring Roll Former Forming Machine
1.Technical data:Final technical data pls contact us ,we will send to you accoring to your drawing of size. 2.shipping 3
Basic Info
Model NO. | c |
Structure | Horizontal |
Transmission Method | Hydraulic Pressure |
Color | Blue or Accordng to Customers′request |
Automation | Full-Automatic |
Control System | Controlled by PLC |
Langauge | English |
Cutter Type | Hydraulic Cutting |
Advantage | Easy Maintain |
Forming Thickness | 0.3mm to 0.6mm |
Container Type | 40 Gp |
Colour | Blue or According to Customer Need |
Guaranty | 12 Months |
Technical Support | Whole Life of Machine |
Installation | Engineer Available Overseas |
Description | Roll Forming Machine |
Function | Use for Roofing |
Transport Package | Naked Packing |
Specification | 6.5*1.2*1.2M |
Trademark | Shengrui |
Origin | Botou |
HS Code | 84629110 |
Production Capacity | 30 Sets/Month |
Product Description
1.Technical data:Final technical data pls contact us ,we will send to you accoring to your drawing of size.Roofing Sheets Roll Forming Machine(Roll Forming,Roll Former ,Steel Sheet Metal Machine) | ||
No. | Item | Specifications |
1 | Coil Width | according to drawings |
2 | Diameter of shaft | 70mm |
3 | Forming Speed | 8-12meters/min |
4 | Middle plate | 16mm |
5 | Material of shaft | 45#steel with tempering |
6 | forming thickness | 0.2mm-0.6mm |
7 | material of rollers | 45#steel |
8 | Cutting type | hydraulic -cutting |
9 | Main power | 4kw+3kw |
10 | Main frame | 300H steel |
11 | Control system | PLC |
12 | Brand of electrical parts | Delta |
13 | Manual decoiler | 5 tons |
14 | Power | 3 Phase,380 Voltage,50Hz |
15 | Dimensions(L*W*H) | About 6.5*1.2*1.2M |
16 | Weight | about 3 tons |
2.shipping
3.workshop
4.FAQ
(1)Are you manufacture or factory ?
we are manufacture and we have more than 10 years'experience.
(2)what's your guaranty of machines?and how to make sure quality of machines?
Guaranty of machines is 12 months.and after finish machines,we will supply video of working machines,also welcome to visit our factory and inspection of machine on site.
(3)Engineer available overseas?
our engineer can go to your place for installation of machines,customers need responsible for round -way flight tickets ,accommodation and engineer's salary is 100usd/day.
(4)if spares broken ,how to deal with it?
we can send new spare to you by DHL courier,about 5 to 7days you can receive them.
(5)what's your payment term?
our payment term is 30% advance payment by T/T,other 70% balance payment before shipment.
5.For more information ,pls contact :